Commercial tile installation

Tile installation for contractors and project teams.

Tell us where the project is, what needs tiling and when the work is planned. Share the drawings or finish schedule you already have, and we will ask for any further information needed for the estimate.

  • Drawings and finish schedules
  • Access and work windows
  • Tile scope and trade handoffs
See what to plan

Commercial project details

Coordinate material, site conditions and sequence together.

Existing drawings and site information help us understand the work. You can contact us before the full package is ready; we will let you know which details are needed for your estimate.

01

Drawings and finish information

Share relevant plans, elevations, room schedules, tile data, pattern intent, edge details and any approved samples or alternates.

02

Receiving surfaces

Identify the substrate, current condition, required build-up, movement locations and who owns preparation before tile setting begins.

03

Access and protection

Include delivery routes, elevators, loading limits, work hours, occupied areas, site protection and material-storage constraints.

04

Sequence and handoffs

Confirm when plumbing, electrical, glazing, cabinetry, waterproofing or other adjacent work must happen and who supplies each required item.

Commercial planning path

Move from bid information to a scope the site team can use.

The exact sequence depends on the project, but these checks keep the tile work connected to the information and trades around it.

  1. 01

    Introduce the project

    Share the location, areas to be tiled, approximate quantities and requested timing. Attach existing drawings or finish information if available.

  2. 02

    Identify conditions and exclusions

    Separate confirmed work from substrate, access, demolition, moisture, levelling or other conditions that still need review.

  3. 03

    Review the estimate and book

    Review the included tile work and price. Once you approve the estimate, we can arrange the installation schedule.

  4. 04

    Confirm installation details

    After booking, we confirm the layout, edges and coordination with adjacent trades before installation.

What helps us assess the work

Tell us about the tile work you need.

Start with the project location, the areas being tiled and your timing. Share the documents you already have; there is no need to prepare a new drawing package just to get in touch.

Request an estimate

Useful answers

Your tile installation questions.

Answers about tile installation, preparation and planning.

What should a contractor send first?

Start with the project location, the areas being tiled, approximate quantities and requested timing. Existing drawings or a finish schedule are helpful if available. We will ask for any further details needed to prepare the estimate.

Can the estimate separate optional or unconfirmed work?

Yes. Clearly identify alternates, allowances and conditions that still need review so they do not read as confirmed installation work.

How should connected trades be handled?

List the plumbing, electrical, structural, glazing, cabinetry and other work meeting the tile scope. The estimate should identify the handoff rather than assuming another trade is included.

Does Mallet Tile supply the tile?

No. Mallet Tile installs the selected material. The project team should identify who supplies tile, trims, drains, profiles and other specified components.

Room view of a grey porcelain-panel fireplace with wrapped returns and a floor-to-wood transition

Tell us about your commercial tile project.

Tell us what you'd like tiled, your city, the approximate area and timing. Include the tile size if you know it. We'll ask if we need anything else for your preliminary estimate.

Get Estimate Call Now